Laser DED additive manufacturing: Spar frame (aerospace)

Industrial challenge

Structural components in TA6V have particularly long lead times when produced by forging, often exceeding 18 months. The aim is to secure the supply chain by producing large blanks (> 1 m) while guaranteeing mechanical properties compatible with aerospace requirements.

Solution implemented

IREPA LASER manufactures blanks using powder-fed laser DED, sized for subsequent machining. The approach is supplemented by numerical simulation to anticipate distortion and adapt the process strategy to large dimensions

Challenge met

Manufacturing large parts requires precise control of distortion as well as control of machining allowances and material quality to secure machining operations. The developments carried out also ensure mechanical properties that meet tensile and fatigue requirements.

Customer results

The solution reduces lead times from over 18 months to less than 3 months. The blanks produced are fully ready for machining, with validated mechanical performance (tensile, fatigue) compliant with specifications.

Téléchargez notre livret
Entrez votre adresse e-mail pour recevoir le lien de téléchargement immédiatement.

Téléchargez notre livret
Entrez votre adresse e-mail pour recevoir le lien de téléchargement immédiatement.